Refelences

License or Sub-License

BIOTECHWORKS-H2, Inc.

3350 Scott Blvd. Suite 5502
Santa Clara, CA, USA 95054

License or Sub-License

License or sub-license the Gasification Isle

Licenses or sub-licenses the gasification technology to preferred project developers. To learn more about being a potential license or sub-license partner, please contact BIOTECHWORKS-H2 with details about your project along with relative company information.

Included in the licensing or sub-licensing package

  • Gasifier and polisher
  • Process design package for gasification isle
  • Technology license of sub-license
  • Arranged Engineering support.

Gasification Isle Integration

Waste Reception and Processing

The project developer is responsible for ensuring feedstock is adequately prepared for the gasification process.

  • Waste entering the gasifier should be between 0.5 and 2 inches (12mm to 50mm) in size.
  • Feedstock up to 20% moisture typically does not require pre-drying.
  • Ash content below 15% is best for efficiency.
  • Feedstock lower heating value above 12-15 MJ/kg (dry basis) is ideal.
  • Heterogenous waste streams including blends of different waste sources are acceptable.

Gasifier

We are the original equipment manufacturer (OEM) of the Gasifier. As part of this equipment package, a project developer would receive:

  • Gasifier technology license or sub-license.
  • Major equipment (vessels, feed equipment, and slag removal).
  • Burners and oxygen/steam lances or sub-license.
  • Automation and controls.
  • Commissioning assistance and operator training.

Waste Heat Boiler or Syngas Quench

  • Selection of waste heat boiler or direct quench will be based on project heat integration study.
  • The waste heat boiler will be supplied by your vendor.
  • The techno-economic analyses offered by our partner, as part of its engineering package, will support developers in making these decisions.

Multi-Stage Gas Cleaning

  • The waste cleaning section removes tar and soot from the raw syngas exiting the gasifier.
  • The multi-stage gas cleaning configuration is specified in Sierra Energy’s process design package (PDP).
  • The gas cleaning section uses commercially available equipment from 3rd party vendors.
  • The soot removed from the syngas is recycled to the gasifier.

Syngas to End-Product Conversion

  • The developer is responsible for the end-product technology.
  • BIOTECHWORKS-H2 and our partner will work with the developer to ensure syngas meets required specifications.
  • Common end-products include hydrogen, methanol, renewable natural gas, and electricity.